Calculators

Flock management and optimization tools

Calculator Parameters

Ross 308

Delivery Load Schedule

7 loads • 27T max • 1d buffer
LoadDeliver BySizeOf Phase
Crumb11.37 T total • 1 load
#1Day 011.37 T1 of 1
Starter9.98 T total • 1 load
#2Day 99.98 T1 of 1
Grower71.36 T total • 3 loads
#3Day 1327.00 T1 of 3
#4Day 2027.00 T2 of 3
#5Day 2517.36 T3 of 3
Withdrawal51.79 T total • 2 loads
#6Day 2827.00 T1 of 2
#7Day 3124.79 T2 of 2
Total: 7 loads144.51 T

Total Feed Order (Buffer Included)

144.51 Tonnes

Net required:140.98 T

CrumbDays 0-9
11.37 TNet: 11.09 T
StarterDays 10-13
9.98 TNet: 9.74 T
GrowerDays 14-28
71.36 TNet: 69.62 T
WithdrawalDays 29+
51.79 TNet: 50.52 T